ADU Permit Process in Holliston, MA

ADU permits in Holliston take 4-8 weeks — Holliston uses by-right approval, so no public hearing is needed.

Step-by-step guide to the ADU permit process in Holliston, Massachusetts. Learn whether you need a special permit or can build by right.

Data verified as of March 2, 2026
State Baseline Only — Local Details Not Yet Researched

ADU Regulations in Holliston

Holliston follows the Massachusetts state baseline under the Affordable Homes Act. This means all Massachusetts state-level ADU rights apply — including by-right approval, no owner occupancy requirement, and standardized size limits. Holliston may also have additional local regulations that supplement the state baseline.

Step-by-Step Permit Process

The by-right ADU permit process in Holliston follows these steps:

  1. Hire an architect or designer to create ADU plans that comply with Holliston's zoning and building codes
  2. Submit plans to Holliston's building department for review
  3. Receive your building permit (typically 4-8 weeks)
  4. Begin construction with licensed contractors
  5. Schedule required inspections during construction
  6. Receive certificate of occupancy upon completion

Required Documents

You'll need the following documents when applying for an ADU permit in Holliston: architectural plans with dimensions and elevations, a site plan showing the ADU location relative to property lines, proof of property ownership, a completed building permit application, and documentation of building code compliance (energy, structural, fire safety).

Inspections and Occupancy

During ADU construction in Holliston, you'll need inspections at key milestones: foundation, framing, rough plumbing/electrical/mechanical, insulation, and final inspection. After passing the final inspection, you'll receive a certificate of occupancy that allows legal use of the ADU as a dwelling unit.

Holliston Building Department

The Holliston Building Inspector is your first point of contact for ADU permits. They are located at 703 Washington St # 2, Holliston, MA 01746, USA. Call (508) 429-0606 for questions about your ADU project. Visit their website for forms and filing instructions.

Important: State Baseline Data

The information on this page reflects Massachusetts state baseline rules. Holliston may have additional local requirements. We recommend confirming with your local building department before starting your project.

Holliston ADU Rules at a Glance

Max Size

900 sq ft

% of Home

50%

Parking

1 space(s)

Approval

BY RIGHT

Owner Occupancy

Not required

Rental Allowed

Yes

Short-Term Rental

Not allowed

Holliston Building Department

Holliston Building Inspector

703 Washington St # 2, Holliston, MA 01746, USA

Phone: (508) 429-0606

Visit Website →

Frequently Asked Questions

Do I need a special permit for an ADU in Holliston?

No. ADUs in Holliston are approved by right — you submit your plans to the building department and receive a building permit without a public hearing or special permit process. This is significantly faster than the old process.

How long does the ADU permit process take in Holliston?

With by-right approval in Holliston, the permit process typically takes 4-8 weeks from plan submission to building permit issuance. There is no public hearing or zoning board review, which eliminates the longest delays in the process.

What documents do I need for an ADU permit in Holliston?

You'll typically need: architectural plans showing the ADU layout and dimensions, a site plan showing setbacks and lot coverage, proof of ownership, and a building permit application. Holliston may also require energy code compliance documentation and septic/sewer capacity verification.

How do I contact Holliston's building department about an ADU?

Contact the Holliston Building Inspector, located at 703 Washington St # 2, Holliston, MA 01746, USA, by calling (508) 429-0606. They can answer questions about ADU permit requirements, plan review, inspections, and local zoning rules specific to Holliston. You can also visit their website for forms and filing instructions.

Can I build an ADU without a permit in Holliston?

No. All ADUs in Holliston require a building permit regardless of size or type. Building without a permit can result in fines, required demolition, and complications when selling your property. The permit ensures your ADU meets building codes for safety, structural integrity, and habitability.

Does state law override Holliston's ADU permit requirements?

Holliston follows the Massachusetts state baseline under the Affordable Homes Act. This means the state guarantees certain rights — like by-right approval — that Holliston cannot restrict. However, you still need to obtain a building permit from Holliston's building department.

How accurate is the ADU data for Holliston?

The information on this page reflects Massachusetts state baseline rules under the Affordable Homes Act. Holliston may have additional local requirements that differ from the state baseline. We recommend confirming with your local building department before starting your project.

Where can I find all ADU regulations for Holliston?

Visit our complete ADU rules page for Holliston, MA for a full overview of zoning, permits, size limits, setbacks, parking, and costs. We cover all Massachusetts municipalities with data sourced from local ordinances and state law.