Home/Massachusetts/Andover/ADU Permit Process in Andover, MA

ADU Permit Process in Andover, MA

ADU permits in Andover take 4-8 weeks — Andover uses by-right approval, so no public hearing is needed.

Step-by-step guide to the ADU permit process in Andover, Massachusetts. Learn whether you need a special permit or can build by right.

Data verified as of March 2, 2026
State Baseline Only — Local Details Not Yet Researched

ADU Regulations in Andover

Andover follows the Massachusetts state baseline under the Affordable Homes Act. This means all Massachusetts state-level ADU rights apply — including by-right approval, no owner occupancy requirement, and standardized size limits. Andover may also have additional local regulations that supplement the state baseline.

Step-by-Step Permit Process

The by-right ADU permit process in Andover follows these steps:

  1. Hire an architect or designer to create ADU plans that comply with Andover's zoning and building codes
  2. Submit plans to Andover's building department for review
  3. Receive your building permit (typically 4-8 weeks)
  4. Begin construction with licensed contractors
  5. Schedule required inspections during construction
  6. Receive certificate of occupancy upon completion

Required Documents

You'll need the following documents when applying for an ADU permit in Andover: architectural plans with dimensions and elevations, a site plan showing the ADU location relative to property lines, proof of property ownership, a completed building permit application, and documentation of building code compliance (energy, structural, fire safety).

Inspections and Occupancy

During ADU construction in Andover, you'll need inspections at key milestones: foundation, framing, rough plumbing/electrical/mechanical, insulation, and final inspection. After passing the final inspection, you'll receive a certificate of occupancy that allows legal use of the ADU as a dwelling unit.

Andover Building Department

The Andover Building Division is your first point of contact for ADU permits. They are located at 36 Bartlet St, Andover, MA 01810, USA. Call (978) 623-8620 for questions about your ADU project. Visit their website for forms and filing instructions.

Important: State Baseline Data

The information on this page reflects Massachusetts state baseline rules. Andover may have additional local requirements. We recommend confirming with your local building department before starting your project.

Andover ADU Rules at a Glance

Max Size

900 sq ft

% of Home

50%

Parking

1 space(s)

Approval

BY RIGHT

Owner Occupancy

Not required

Rental Allowed

Yes

Short-Term Rental

Not allowed

Andover Building Department

Andover Building Division

36 Bartlet St, Andover, MA 01810, USA

Phone: (978) 623-8620

Visit Website →

Frequently Asked Questions

Do I need a special permit for an ADU in Andover?

No. ADUs in Andover are approved by right — you submit your plans to the building department and receive a building permit without a public hearing or special permit process. This is significantly faster than the old process.

How long does the ADU permit process take in Andover?

With by-right approval in Andover, the permit process typically takes 4-8 weeks from plan submission to building permit issuance. There is no public hearing or zoning board review, which eliminates the longest delays in the process.

What documents do I need for an ADU permit in Andover?

You'll typically need: architectural plans showing the ADU layout and dimensions, a site plan showing setbacks and lot coverage, proof of ownership, and a building permit application. Andover may also require energy code compliance documentation and septic/sewer capacity verification.

How do I contact Andover's building department about an ADU?

Contact the Andover Building Division, located at 36 Bartlet St, Andover, MA 01810, USA, by calling (978) 623-8620. They can answer questions about ADU permit requirements, plan review, inspections, and local zoning rules specific to Andover. You can also visit their website for forms and filing instructions.

Can I build an ADU without a permit in Andover?

No. All ADUs in Andover require a building permit regardless of size or type. Building without a permit can result in fines, required demolition, and complications when selling your property. The permit ensures your ADU meets building codes for safety, structural integrity, and habitability.

Does state law override Andover's ADU permit requirements?

Andover follows the Massachusetts state baseline under the Affordable Homes Act. This means the state guarantees certain rights — like by-right approval — that Andover cannot restrict. However, you still need to obtain a building permit from Andover's building department.

How accurate is the ADU data for Andover?

The information on this page reflects Massachusetts state baseline rules under the Affordable Homes Act. Andover may have additional local requirements that differ from the state baseline. We recommend confirming with your local building department before starting your project.

Where can I find all ADU regulations for Andover?

Visit our complete ADU rules page for Andover, MA for a full overview of zoning, permits, size limits, setbacks, parking, and costs. We cover all Massachusetts municipalities with data sourced from local ordinances and state law.

Check Your Address

See exactly what ADU rules apply to your specific property in Andover.